Project: EaglesWing   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Todd Luebstorf   -  
Project:   Zenith CH750SD   -   VIEW REPORTS
Total Hours:496.7
Total Flight Time:
Start/Last Date:Dec 12, 2019 - No Finish Date
Engine:Viking 195
Panel:Dynon
 
Friendly URL: https://eaabuilderslog.org?s=EaglesWing

Home or Last Project Picture

Mar 27, 2022     Flaperons - (4.3 hours)       Category: Slats/Flaps
Installed solid AD #5 rivets on the L/H inboard flaperon end L brackets and the 3 hinge brackets.
On the R/H inboard flaperon needed to drill some of the end ribs and brackets for #5 rivets. They were drilled for #4 rivets. Dimple and installed rivets through the end ribs tooling holes. Decided to install flush rivets on the outboard splice plate on the face of it. There were only 4 holes drilled through the splice plate but the rib had 2 extra holes drilled in it so drilled those 2 holes through the splice plate. Deburred and sanded the edges of all the end pieces.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.